Cutting-edge construction

Our structures are built to last. We use cutting edge construction technology and adopt the best practices in construction, safety and compliance. We take pride in delivering high quality products in the quickest time possible.

Rock Solid Structures

our structures are precision engineered with incredibly smooth concrete finishes, and are highly leak resistant and rock solid. On-site batching plants at our sites generate high-grade concrete on-demand, and an on-site material testing lab ensures the highest quality finishing. Concrete is the single most important material in construction. We obsess about the quality of our concrete at each and every step of production.

Acrylic Waterproofing Compounds: We go a step further in preventing leaks. Traditional waterproofing compounds require curing – you are required to maintain very specific temperature and moisture conditions for weeks else the material fails. This is almost impossible to achieve and monitor in an active construction site and is prone to human error. We use cutting edge acrylic waterproofing compounds that don’t require such curing ensuring our structures are leak proof.

Micro-Managed Quality

Our engineers go right till the source of the raw material to ensure that quality is uncompromised. Marathon always uses premium and time-tested materials for all the finishes, from the external paint to the interior flooring.

On-site quality testing labs
Our engineers go to the very source of concrete aggregates (raw material) to ensure they are of the right size and shape.

High quality raw materials
Our engineers go to the very source of concrete aggregates (raw material) to ensure they are of the right size and shape.

External Paints
We always use premium, polymer based external paints that typically cost twice as much as what is used in the industry. These paints prevent green patches that you typically see on buildings due to growth of microorganisms. They are also highly resistant to ultraviolet rays and do not fade easily.

Tiling Practices
Typically, the tiles are fixed with cement. But cement often provides an uneven surface. This is why we use adhesives that spread themselves evenly and prevent the tiles from cracking. We even lay the tiles in each toilet ensuring that the toilet fixtures come either in the centre of a tile or at a joint so that it looks perfectly symmetrical.

Road Design
Even the roads we make are of an incredible quality. We hire road design consultants to custom design our roads based on soil characteristics beneath.

Pioneers of Best Practices

We do not outsource our construction and our engineers retain full control over construction quality. With our leadership team having decades of engineering and construction expertise.

In-Sourcing
While most of the industry outsources the construction of their projects to contractors, B.M. Infra does the entire construction in house. This gives us complete control over the quality of our construction.
Typically, once a developer has his final drawings for a project ready, he hands them over to a general contractor thereby outsourcing the actual construction of the project. The contract is at a fixed price, so the only way the contractor will make money is by reducing his own cost. This creates a conflict of interest – the contractor is incentivised not to deliver great quality, but to cut corners, use cheap materials and save cost.
We build our projects ourselves (*we only outsource the labour). This allows us to be in complete control of the quality. And if something goes wrong, we know exactly how to fix it and don’t get into blame games with the contractor. We make decisions that may increase costs but will help in the long term – the rest of the page highlights the hundreds of such big and small things that are a part of our project.

Optimising Energy Usage

We have conducted extensive solar and wind studies to ensure that the Villas are oriented to maximize natural light and ventilation while reducing energy consumption.

Water Savings
We have sewage treatment plant in our project that results in huge water savings.